VDM Group

Pivotal Point

Client: HSP Developments
Location: Gold Coast, QLD

 

Development consists of a 41 storey residential apartment tower with triple hydrostatic basement and main, partially post-tensioned transfer podium at Level 1.  

VDM Consulting was responsible for structural and civil design services.  

Key aspects of the design included:

  • 1.5m deep raft foundation under maintenance tower.
  • Secant piling basement walls in close proximity to neighbouring buildings.
  • Large post-tensioned pool deck at Level 5.
  • Innovative slab connection details at jump-formed core walls.
  • Bridge and atrium structure to adjacent 5 level commercial complex.
  • Incorporation of high level column transfers at Level 35.